IPA and IEPA Release Draft Resource Adequacy Mitigation Plan for Stakeholder Feedback

The Illinois Power Agency (IPA) and the Illinois Environmental Protection Agency (IEPA) have released the draft Mitigation Plan required under Section 9.15(o) of the Illinois Environmental Protection Act.

The Mitigation Plan serves to assess whether to allow any plants whose emission reduction deadlines may impose reliability concern to continue operating, including operating with reduced emissions or as emergency backup where appropriate. 

The draft Mitigation Plan was developed with support from the IPA’s Procurement & Planning Consultant, Energy and Environmental Economics Inc. (E3), and informed by stakeholder workshops conducted in 2026. 

The Climate and Equitable Jobs Act (CEJA) tasked the IPA, IEPA, and Illinois Commerce Commission (ICC) with developing a comprehensive study to assess “the current and projected status of electric resource adequacy and reliability throughout the State.”  That Resource Adequacy Study was published in December of 2025 and concluded that Illinois faces a resource adequacy risk over the coming decade.  Based on this finding, CEJA directed the IPA and IEPA to “develop a plan to reduce or delay CO2e and copollutant emissions reductions requirements only to the extent and for the duration necessary to meet the resource adequacy and reliability needs of the State.”      

 

Review the Draft Mitigation Plan and Submit Comments:

  • Review the draft Mitigation Plan here
  • The IPA and IEPA are seeking stakeholder feedback on the draft Mitigation Plan through a 60-day public comment period, opening November 16, 2026, and closing January 15, 2027, at 5:00 p.m. CT.
  • Comments must be submitted to the IPA at IPA.ContactUs@illinois.gov
  • The draft Mitigation Plan is available on the IPA, IEPA, and ICC websites. Comments submitted during the stakeholder feedback period will be posted on the Agencies’ websites.

 

Preliminary Key Findings:

  • Statewide adequacy and reliability challenges persist. Updated projections show that resource adequacy needs continue across the PJM and MISO regions of Illinois.
  • Resource adequacy modeling demonstrates that retaining certain CEJA-limited units can support reliability during a limited number of high-risk hours without producing large amounts of energy and associated emissions throughout the year.
  • The majority of the reliability and customer affordability benefits associated with extending closure deadlines come from gas and oil units—not from coal units. Continued availability of CEJA-limited units preserves near-term flexibility as Illinois undertakes a substantial buildout of new energy resources, while allowing the state to continue making progress toward its decarbonization goals.
  • Near-term retirements of CEJA-limited units could lead to the development of new natural gas generation outside Illinois to meet the state’s reliability needs.
  • Retirement of CEJA-limited units without sufficient replacement capacity could increase consumers’ exposure to capacity market costs.
  • Extending eligible gas and oil units, but not coal units, best balances affordability, reliability, emissions reductions, and environmental justice considerations.

 

Proposed Recommendations:

  • Given a potential resource adequacy or reliability deficiency remains reasonably likely, the draft plan proposes the extension of the applicable CEJA deadlines for certain covered units (those units subject to Section 9.15(i) of the Illinois EPA Act’s zero carbon emission requirements enacted through CEJA) through at least the end of the 2032-2033 planning year.
  • Under CEJA, any extension should be limited to the extent necessary to address the identifiable need. The proposed extension is therefore intended to preserve near-term reliability while replacement resources are developed, and future reliability needs are reassessed.
  • Authorization of the extension of the applicable CEJA deadlines lies with the Illinois Commerce Commission (ICC), through the Order that will follow litigation of the Mitigation Plan.

 

Next Steps:

Following the close of the stakeholder feedback period on January 15, 2027, the IPA and IEPA will have 30 days to review submitted comments, make any necessary updates, and file the final Mitigation Plan with the ICC.